Beach Energy Limited (ASX:BPT) Monthly Drilling Report - February 2012

Workover operations have successfully cleaned out the Encounter-1 wellbore in PEL 218 (Beach 100%). Tubing will now be installed ready for the fracture stimulation activities which are now expected to occur in early April once the fracture stimulation crew has completed a program with the Cooper Basin Joint Venture (Beach 20.21%).

The Moonta-1 well (PEL 218, Beach 100%) continued drilling during February, and is currently at a depth of 2,924 metres and waiting on weather. Once access is re-established and drilling resumes, it is expected that Moonta will take about 25 days to reach its planned total depth. This well is the first in a campaign of at least five wells designed to delineate the resource potential of the shale and basin centred gas exploration volumes within the Nappamerri Trough.

Beach Operated Cooper-Eromanga Oil and Gas

Ten of the eleven successful wells from the 2011 drilling campaign have now been completed for production, and are being progressively brought on-line as capacity allows.

Two exploration wells (Coolawang-1 and Coolangatta-2) were drilled in Beach-operated permits during the report period.

The Coolawang-1 exploration well (PEL 106B, Beach 50%) was the third of five planned exploration wells designed to test for stratigraphically trapped gas on the Patchawarra Trough margin, and togather additional data on the Patchawarra Formation deep coal gas play. The well cored a 29 metre interval of the Patchawarra Formation recovering approximately 8 metres of Patchawarra coal that will be evaluated as part of the Joint Venture's unconventional gas strategy in this area. A sandstone with gas shows was tested and flowed at a stabilised rate of 4.5 million cubic feet per day with no water and without decline. Coolawang-1 has been cased and suspended as a successful gas discovery, and two additional sandstones with gas shows will be evaluated in a production testing program. A further two wells are planned in this campaign. The rig will move to the Haslam-1 location as soon as weather conditions allow.

The Coolangatta-2 exploration well (ATP 633P, Beach 50%) was drilled to test the oil potential of the Coolangatta structure updip of Coolangatta-1 (drilled in 2008). A drill stem test of the Murta Formation was conducted to test oil shows, but recovered only formation water with traces of oil. Coolangatta-2 was subsequently plugged and abandoned.

The rig has since moved to and commenced drilling at the Marsden-1 location in PEL-95 (Beach 50%). The well had reached a depth of 1,908 metres in the Toolachee Formation before heavy rain in the Cooper Basin region forced road closures and a temporary shutdown of drilling operations. Access is expected to be restored within about two weeks following which drilling operations will resume.

Senex Operated Cooper-Eromanga Oil -Western Flank (Beach 40%)

Two wells, the Spifire-1 exploration well and the Growler-8 development/appraisal well, completed drilling within the PEL 104/PRL 15 permits (Beach 40%) during the month. Spitfire-1 successfully intersected the target Birkhead reservoir, but a series of four drill stem tests indicated that only the upper portion was oil and the lower, better quality sandstone held water. The well was consequently plugged and abandoned as a sub-commercial oil discovery.

Growler-8 also intersected the mid-Birkhead reservoir, of which the upper 9 metres is oil saturated (approximately 6 metres of pay) and the lower 10 metres is water-wet. This is the first intersection of the oil-water contact in the Growler Field and the most westerly development well, approximately 1,100 metres from Growler-1. Growler-8 has been cased and will be completed as a Birkhead oil producer. The rig has subsequently moved to drill an exploration well, Thunderchief-1, approximately 7 kilometres to the northeast of the Growler Field and is at a depth of 653 metres while waiting on weather and road access.

Santos Operated Cooper Basin Oil and Gas Development

Two gas development wells were drilled during the month; Tindilpie-14 in South Australia (Beach 20.21%) and Durham Downs North-3 in Queensland (Beach 23.20%), with both cased and suspended as future gas producers.

Two oil wells, Charo-8 and Charo-9, were drilled as the first of a planned nine-well program to develop the Charo Field (Beach 20.21%) in South Australia. Both wells successfully intersected the target mid-Birkhead reservoir; Charo-8 has been cased and suspended and Charo-9 is waiting on road access to finish off case and suspend operations.

INTERNATIONAL

Kuwait Energy Operated - Abu Sennan Concession, Egypt

El Salmiya-1 (Beach 22%), located approximately 10 kilometres east of the Al Ahmadi-1 and ZZ-4 discoveries, has flowed oil, condensate and gas at a combined rate of 5600 barrels of oil equivalent per day during a test program. The well is currently being completed to be ready for production to an Early Production Facility once the Development Lease is approved by EGPC. El Salmiya-1 is the fourth successive success in the Abu Sennan permit.

The final two wells in the current campaign, Salwa-1 and Hawalli-1, have reached total depth and are currently being evaluated. These wells are located approximately 15 and 25 kilometres, respectively, southwest of the Al Ahmadi-1 and ZZ-4 discoveries.

For the full release, please visit:
http://media.abnnewswire.net/media/en/docs/ASX-BPT-187281.pdf


About Beach Energy Limited:

Beach Energy Limited (ASX:BPT) is a long established oil and gas Exploration and Production Company, based in Adelaide, South Australia.

Contact:
Beach Energy Limited
T: +61-8-8338-2833
F: +61-8-8338-2336
WWW: www.beachenergy.com.au

 


Source:

Beach Energy Limited

Copyright (C) 2012 ABN Newswire. All rights reserved.

Related Stocks:
Stock Market XML and JSON Data API provided by FinancialContent Services, Inc.
Nasdaq quotes delayed at least 15 minutes, all others at least 20 minutes.
Markets are closed on certain holidays. Stock Market Holiday List
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
Press Release Service provided by PRConnect.
Stock quotes supplied by Telekurs USA
Postage Rates Bots go here

June 19, 2013

June 18, 2013

June 17, 2013

June 14, 2013

June 13, 2013

June 12, 2013

June 11, 2013

June 10, 2013

June 07, 2013


Most Read Features

Most Read Around the Web

Most Read This Just In

Asetek

Feature Articles

My Supercomputer is Bigger Than Yours!

Contributing commentator, Andrew Jones, offers a break in the news cycle with an assessment of what the national "size matters" contest means for the U.S. and other nations...
Read more...

Alternatives Emerge as Linpack Loses Ground

Today at the International Supercomputing Conference in Leipzing, Germany, Jack Dongarra presented on a proposed benchmark that could carry a bit more weight than its older Linpack companion. The high performance conjugate gradient (HPCG) concept takes into account new architectures for new applications, while shedding the floating point....
Read more...

Intel Snaps New Grips to HPC Hook

Not content to let the Tianhe-2 announcement ride alone, Intel rolled out a series of announcements around its Knights Corner and Xeon Phi products--all of which are aimed at adding some options and variety for a wider base of potential users across the HPC spectrum. Today at the International Supercomputing Conference, the company's Raj....
Read more...

Short Takes

Developers Tout GPI Model for Exascale Computing

Jun 19, 2013 | Supercomputer architectures have evolved considerably over the last 20 years, particularly in the number of processors that are linked together. One aspect of HPC architecture that hasn't changed is the MPI programming model.
Read more...

Supercomputers: Not Always the Best for Big Data

Jun 18, 2013 | The world's largest supercomputers, like Tianhe-2, are great at traditional, compute-intensive HPC workloads, such as simulating atomic decay or modeling tornados. But data-intensive applications--such as mining big data sets for connections--is a different sort of workload, and runs best on a different sort of computer.
Read more...

Gordon Flashes Its Versatility in HPC Workloads

Jun 18, 2013 | Researchers are finding innovative uses for Gordon, the 285 teraflop supercomputer housed at the San Diego Supercomputer Center (SDSC) that has a unique Flash-based storage system. Since going online, researchers have put the incredibly fast I/O to use on a wide variety of workloads, ranging from chemistry to political science.
Read more...

Supercomputers: Still the King of the HPC Hill

Jun 17, 2013 | The advent of low-power mobile processors and cloud delivery models is changing the economics of computing. But just as an economy car is good at different things than a full size truck, an HPC workload still has certain computing demands that neither the fastest smartphone nor the most elastic cloud cluster can fulfill.
Read more...

TACC Longhorn Takes On Natural Language Processing

Jun 14, 2013 | For all the progress we've made in IT over the last 50 years, there's one area of life that has steadfastly eluded the grasp of computers: understanding human language. Now, researchers at the Texas Advanced Computing Center (TACC) are utilizing a Hadoop cluster on its Longhorn supercomputer to move the state of the art of language processing a little bit further.
Read more...

Sponsored Whitepapers

Best Practices in Big Data Storage

05/10/2013 | Cleversafe, Cray, DDN, NetApp, & Panasas | From Wall Street to Hollywood, drug discovery to homeland security, companies and organizations of all sizes and stripes are coming face to face with the challenges – and opportunities – afforded by Big Data. Before anyone can utilize these extraordinary data repositories, however, they must first harness and manage their data stores, and do so utilizing technologies that underscore affordability, security, and scalability.

Progress in Parallel: the Bull Parallel Programming Center

04/15/2013 | Bull | “50% of HPC users say their largest jobs scale to 120 cores or less.” How about yours? Are your codes ready to take advantage of today’s and tomorrow’s ultra-parallel HPC systems? Download this White Paper by Analysts Intersect360 Research to see what Bull and Intel’s Center for Excellence in Parallel Programming can do for your codes.

Sponsored Multimedia

HPCwire Live! Atlanta's Big Data Kick Off Week Meets HPC

Join HPCwire Editor Nicole Hemsoth and Dr. David Bader from Georgia Tech as they take center stage on opening night at Atlanta's first Big Data Kick Off Week, filmed in front of a live audience. Nicole and David look at the evolution of HPC, today's big data challenges, discuss real world solutions, and reveal their predictions. Exactly what does the future holds for HPC?

Webinar: Mellanox Virtual Modular Switch, the Most Efficient 40GbE Aggregation Switch Solution

Join our webinar to learn how IT managers can migrate to a more resilient, flexible and scalable solution that grows with the data center. Mellanox VMS is future-proof, efficient and brings significant CAPEX and OPEX savings. The VMS is available today.

Atlanta's Big Data Kick Off Week Meets HPC Cray

Newsletters

Stay informed! Subscribe to HPCwire email Newsletters.

HPCwire Weekly Update
HPC in the Cloud Update
Digital Manufacturing Report
Datanami
HPCwire Conferences & Events
Job Bank
HPCwire Product Showcases


Xyratex

HPC Job Bank

HPCwire Events

Featured Events






  • November 17, 2013 - November 22, 2013
    SC'13
    Denver, CO
    United States